Project Description
H&R Construction completed this project in a 16 month timeframe. This new branch for Telco Triad Community Credit Union will serve as the main headquarters for all of Telco Triad’s locations, replacing their aging facility. One of the unique features of this building is the full depth basement. This created some challenges from a scheduling standpoint with getting the structure out of the ground during the fall and winter months. Once that portion was complete, the rest of the project moved rapidly towards completion. The three-level facility has many design elements that utilize various finish materials. Interior finishes consisted of different types of tile, carpet, and LVT, along with casework, solid surface quartz, and decorative glass panels, acoustical panel ceilings and linear metal ceilings. Exterior finishes consisted of brick and stone veneer, along with aluminum metal panels.
Project Details
Contract Type: General Contractor
Project Type: New Construction
Location: Sioux City, IA
Similar Projects
H&R Construction carried out extensive renovations on Sterling Computer’s corporate headquarters in North Sioux City, SD.
We remodeled an existing 60,000 sq. ft. retail store into a recreational sports facility that has five basketball/volleyball courts, a wrestling room, dance studio, concessions and lounge area.
This Class A project includes a training center, sales and customer services space with room to grow and expand in the future.
This new branch location will serve as the main headquarters for all Telco Triad locations; with one unique feature, a full depth basement.
This hangar building consists of 12,000 sq. ft. of airplane storage space and 3,000 sq. ft. of pilot’s quarters, lounge, and equipment storage with many unique features.
H&R Construction did interior and exterior renovation to turn the old Gordmans store in Sioux City into separate tenant spaces.