Rich Products - Crest Hill


 
 

Project Description

H&R Construction was selected as Construction Manager to assist in design, budgeting, and management of the construction of this 215,000 sq. ft. Cold Storage Distribution facility for Rich Products in conjunction with Cloverleaf Cold Storage in Crest Hill, IL. This project was completed in a 10-month time frame.

Features:

  • VSL Dock Levelers

  • Rite Hite Bi-Parting Freezer Doors

  • 220,000 Sq. Ft. Paving

  • Ductil-Crete Floor System

  • FF50/FL35 Floor Flatness

  • Quell Fire Sprinkler

  • Eagleson Control System

  • Digital Lumens LED Lighting

  • 24 Dock Positions

  • -10°F Freezer/40°F Coolers

  • 260’ Elevated Bridge Connection to Production Plant

 

Project Details

Contract Type: General Contractor Design/Build

Project Type: New Construction

Size: 215,000 Sq. Ft.

Client Reference: Rich Products

Location: Crest Hill, IL


 